Signalling review
ORR’s Signalling Review will determine the funding necessary to renew and maintain the signalling systems in an efficient manner. Driving down unit and total costs, minimising operational disruption and improving reliability for railway users are key issues under consideration. It is looking at signalling in its widest context – from the signals themselves to control centres, level crossings and train protection. The Signalling Review will also address other related issues such as the introduction of new technology, enhancements and safety requirements.
Background
In the Access Charges Review 2003 (ACR2003), the Rail Regulator concluded that Network Rail’s signalling strategy was insufficiently developed to support its proposed increase in signalling renewals spending in the last three years of the control period. Therefore, the final conclusions of ACR2003 provided for an interim review of signalling costs (the Signalling Review) to be carried out.
A two phase review
Following the consultation document in November 2004 it has been agreed that the review will be done in two phases. We have now published the final conclusions for the medium-term review which determines the funding for CP3 (to 2009).
The 2005 Railways Act introduced some important changes to the conduct of access charges reviews and the Periodic Review 2008 will be conducted in a significantly different way. As a result, we have decided to change the timescales for the long-term Signalling Review so that it is more closely aligned to the Periodic Review process. The long-term review will determine the funding for CP4 (to 2014).
| Network Rail commenced work on Signalling Review | Jun 2004 |
| ORR published industry letter | Aug 2004 |
| ORR published consultation document | Nov 2004 |
| Network Rail medium-term (to 2009) funding submission to ORR | Apr 2005 |
| ORR published industry letter | May 2005 |
| ORR medium-term review: draft conclusions | Sep 2005 |
| ORR medium-term review: final conclusions | Dec 2005 |
| Network Rail long-term (to 2014) technical strategy submission to ORR | Apr 2006 |
| Network Rail long-term funding submission to ORR (as part of Periodic Review submission) |
Jun 2006 |
| ORR long-term review: draft conclusions | Feb 2007 |
| Network Rail post HLOS funding submission to ORR |
Oct 2007 |
| ORR long-term review: conclusions for at least the early part of CP4 |
Autumn 2007 |
| ORR long-term review: final conclusions (as part of the Periodic Review 2008) | Oct 2008 |
Documentation
The following documents are available for download as PDF files:
|
14 Feb 2007 |
Periodic review 2008 - Timescales for signalling conclusions letter |
|
|
21 Dec 2005 |
Signalling Review: final conclusions of the medium-term review |
|
|
7 Sep 2005 |
1- Signalling review: Draft conclusions of the medium-term review
|
|
|
19 May 2005 |
|
|
| Apr 2005 | Network Rail's signalling review medium term funding submission | |
|
17 Nov 2004 |
1- Signalling review - Initial consultation on the review process
|
|
| 6 Aug 2004 | Signalling review industry letter |
Consultants' papers
| 28 Jul 2005 | SICA application and business planning review - Report by Lloyds Register Rail |
| 1 Jul 2005 | Independent Assessment of SICA using PAS 55 as a guide - Report by Lloyds Register Rail |
| 28 Jun 2005 | Indexation of Network Rail’s signalling costs - Report by Oxera |