ORR - THE OFFICE OF RAIL REGULATION - WWW.RAIL-REG.GOV.UK

Improvement Notices

Information on Improvement notices issued by ORR since 1 April 2006 are available for download as Adobe Acrobat PDF files below.

Company Brief description Issue date Compliance date Result
Network Rail Infrastructure Ltd Failure to provide a safe system of work, to ensure so far as is reasonably practicable the safety of those authorised users who may wish to use Lower Pratts User Worked Crossing. 20 May 2008 30 Jul 2008 Open
Network Rail Infrastructure Ltd The time taken from when the Cosham level crossing barriers begin to descend until they reach the lowered position for both the left hand and right hand barriers is too fast (less than 6 to 10 seconds). 27 May 2008 30 Jun 2008 Open
Network Rail Infrastructure Ltd The road surface at Cosham level crossing has not been maintained in a good and even condition, and was in use with loose, misaligned road panels and unacceptable gaps. 15 May 2008 31 Aug 2008 Open
Network Rail Infrastructure Ltd Failure to implement  any effective means of controlling the risk to persons who may use the Brickyard Farm footpath crossing between 23.00 and 07.00 hrs 9 May 2008 16 Jun 2008 Complied
Network Rail Infrastructure Ltd Ferry Lane Footpath Crossing whilst open for use was unfit for that purpose, thereby exposing persons not in your employment to the risk of injury or death. Subsequent investigations found that there were no arrangements in place for obtaining temporary closure of the footpath crossing whilst infrastructure maintenance takes place. 9 May 2008 26 Aug 2008 Open
Network Rail Infrastructure Ltd Failure to implement any effective means of controlling the risk to persons who may use the Ferry Road footpath crossing between 23.00 and 07.00 hrs 9 May 2008 16 Jun 2008 Complied
Network Rail Infrastructure Ltd Failure to implement any effective means of controlling the risk to persons who may use the Wissett footpath crossing between 23.00 and 07.00 hrs 9 May 2008 16 Jun 2008 Complied
Network Rail Infrastructure Ltd Unworked crossover points near Ockley Station not under control of signaling system. Therefore the position of the points is not detected for train movements over them. This creates a risk of train derailment or collision and does not ensure, so far as is reasonably practicable, the safety of persons using the railway. 22 Apr 2008 31 Dec 2008 Open
Network Rail Infrastructure Ltd Insufficient warning time for pedestrians on footpath crossing at West Lodge Level Crossing. Gates of both pedestrian and vehicular crossings do not comply with Railway Group Standards. Also incorrect signage at the crossing. 19 Feb 2008 31 Oct 2008 Open
Network Rail Infrastructure Ltd Failing to manage and operate the level crossing in a manner that complies with Schedule 3, Paragraph 3 of the Scremerston Level Crossing Order 1979 as amended 19 Feb 2008 20 Mar 2008 Complied
English Welsh & Scottish Railways Ltd Not managing, operating and maintaining the level crossings within Immingham Docks estate to a suitable consistent standard therefore endangering the safety of all level crossing users. 23 Jan 2008 30 Apr 2008 Complied
Associated British Ports Holdings Ltd Not managing, operating and maintaining the level crossings within Immingham Docks estate to a suitable consistent standard therefore endangering the safety of all level crossing users. 23 Jan 2008 30 Apr 2008 Complied
Hoo - Bee Agrics To formally develop and put into practice a safe system of work at the Smeafield Farm user worked crossing and ensure employees are briefed on and follow that system. 16 Oct 2007 5 Dec 2007 Complied
Network Rail Infrastructure Ltd System for planning and monitoring basic visual inspection of track requires improvement to ensure serious defects are identified. 12 Dec 2007 31 Mar 2008 Open
London Underground Ltd Reasonably practicable measures have not been taken to ensure train operators are sufficiently certain that all persons are clear of the train prior to self-dispatch. 28 Nov 2007 29 Feb 2008 Complied
Dean Forest Railway Co Ltd Appropriate arrangements are not in place for the effective planning, organisation, monitoring and control of preventative and protective measures to ensure the safe operation of trains. 20 Nov 2007 31 Jan 2008 Complied
Network Rail Infrastructure Ltd The footpath crossing at 74 miles, 28 chains on the Ely to Norwich railway line is not being properly maintained. 12 Jul 2007 11 Jan 2008 Complied 
Network Rail Infrastructure Ltd The footpath crossing at 74 miles, 30 chains on the Ely to Norwich railway line is not being properly maintained. 12 Jul 2007 11 Jan 2008 Complied
Network Rail Infrastructure Ltd The footpath crossing, 47 miles, 45 chains on the Bethnal Green to Kings Lynn railway line, is not being properly maintained. 12 Jul 2007 11 Jan 2008 Complied
Network Rail Infrastructure Ltd The footpath crossing at 78 miles, 4 chains on the Ely to Peterborough railway line is not being properly maintained. 12 Jul 2007 11 Jan 2008 Complied
Network Rail Infrastructure Ltd The level crossing half barriers do not rise as soon as a stopping down direction train has passed the crossing. 4 Sep 2007 1 Dec 2007 Complied
Anthony W D Pexton T/A R Pexton & Sons A safe system of work is needed for using two user worked crossings at Abbey Farm. 6 Jul 2007 1 Aug 2007 Complied
Serco Ltd Arrangements are not in place to ensure, so far as is reasonably practicable, that unauthorised persons on the track are not exposed to risks from the movement of trains. 12 Jul 2007 13 Aug 2007 Complied
Network Rail Infrastructure Ltd Inadequate measures are in place at  London Victoria station for identifying safe access routes across the roofs, in particular which roofs are fragile and which are not.Inadequate induction and permit to work arrangements for working at height. 4 Apr 2007 6 Jul 2007 Complied
Wensleydale Railway plc Failed to ensure, so far as is reasonably practicable, that the surface of the carriageway over the crossing is maintained in good and even condition. 28 Feb 2007 25 Mar 2007 Complied
Jarvis plc Failed to ensure, so far as is reasonably practicable, that persons working in trackwork possessions are not at risk from the movement of On Track Plant and Engineering Trains. 21 Feb 2007 15 Apr 2007 Complied
Network Rail Infrastructure Ltd Allowing self propelled work equipment to operate without any emergency facilities operated by readily accessible controls or automatic system for braking and stopping. 29 Jan 2007 31 Dec 2007 Complied
First Great Western (First Group) Arrangements for ensuring that rail vehicles undergoing maintenance are returned to service in a safe condition following such maintenance are inadequate. 17 Nov 2006 1 Jan 2007 Complied
Dean Forest Railway Co Ltd Materials containing asbestos scattered over an area of ground adjacent to railway sidings. 13 Oct 2006 1 Dec 2006 Complied
D V Howells Ltd Failure to co-operate with other employers sharing a workplace. 11 Sep 2006 13 Nov 2006 Complied
Ian Farmer Associates (1998) Ltd Failure to co operate with other employers sharing a workplace. 11 Sep 2006 13 Nov 2006 Complied
Network Rail Infrastructure Ltd Employees allocated to incompatible safety-critical roles. 16 Oct 2006 22 Dec 2006 Complied
Tyne & Wear PTE Existing cab secure radio system does not provide communications between metro cars and the control centre. 3 Aug 2006 14 Feb 2007 Complied
Advenza Freight Ltd Inadequate driver management policies to enable the risks to drivers and others to be minimized. 20 Sep 2006 10 Nov 2006 Complied
Advenza Freight Ltd Inadequate content of driver safety files.Unable to demonstrate that train drivers are competent to carry out such work. 20 Sep 2006 10 Nov 2006 Complied
Carlisle Cleaning & Support Services Ltd Inappropriate steps to reduce the risk of injury to employees whilst using the manually operated trailer at Manchester Piccadilly. 19 Sep 2006 15 Feb 2007 Complied
Network Rail Infrastructure Ltd Inadequate back up arrangements to support the telephone system at York ICC. 15 Sep 2006 12 Oct 2006 Complied
Network Rail Infrastructure Ltd Telephone system at York ICC does not provide effective communications between the control centre and users. 15 Sep 2006 31 Oct 2006 Complied
Tramtrack Croydon Ltd Reduction of risk of injury from derailment at sprung points. 2 Oct 2006 30 Apr 2007 Complied
Tramtrack Croydon Ltd Safe operation of the network. 2 Oct 2006 30 Apr 2007 Complied
Freightliner Heavy Haul Limited Dagenham Dock "Down Side" Yard. 20 Jul 2006 31 Aug 2006 Complied
Network Rail Infrastructure Ltd(LNW) NRIL - Yard security - Saltley Yard. 26 Apr 2006 31 Aug 2006 Complied
Network Rail Infrastructure Ltd(LNW) NRIL - Yard security - Bescot Yard. 26 Apr 2006 30 Jun 2006 Complied
English Welsh and Scottish Railway Ltd EWS - Yard Security - Saltley Yard. 26 Apr 2006 30 Jun 2006 Complied
English Welsh and Scottish Railway Ltd EWS - Yard Security - Bescot Yard. 26 Apr 2006 30 Jun 2006 Complied
Metronet SSL Ltd Track maintenance, District Line. 21 Apr 2006 4 Sep 2006 Complied