| Company | Brief description | Issue date | Compliance date | Result |
|---|---|---|---|---|
| London Underground | The floor of the traffic route from Cannon St into the underground station is not of a construction that is suitable for use by passengers or employees by virtue of the risks to the safety of passengers and employees created by the rising step across the Cannon Street entrance to the station. | 4 Nov 2009 | 26 Nov 2009 | Complied |
| Network Rail Infrastructure Ltd | Work in Ledbury tunnel was not planned, managed and monitored so as to ensure, so far as is reasonably practicable, the safety of workers in the possession site. | 14 Oct 2009 | 14 Dec 2009 | Open |
| Network Rail Infrastructure Ltd | The fault management process is not being resourced and managed to ensure that off-track faults and reports are being suitably controlled, monitored, reviewed, actioned and closed out so that any risks identified are being adequately controlled. | 24 Sep 2009 | 8 Jan 2010 | Open |
| Michael J Watkins | Failure to put in place a safe system of work for vehicles using the Cross Brook Farm level crossing. | 22 Sep 2009 | 21 Oct 2009 | Complied |
| Network Rail Infrastructure Limited | There is no suitable backup battery power supply for this relay room to enable signals to continue to operate effectively during power outages. | 21 Sep 2009 | 21 Dec 2009 | Open |
| Network Rail Infrastructure Limited | There is no suitable backup battery power supply for this relay room to enable signals to continue to operate effectively during power outages. | 21 Sep 2009 | 21 Dec 2009 | Open |
| Midland Railway Trust Ltd | Failure to have in place an established and maintained safety management system, that meets the statutory requirements. | 17 Sep 2009 | 31 Jan 2010 | Open |
| Network Rail Infrastructure Limited | Insufficient measures to prevent unauthorized persons gaining access to the infrastructure along a mains water pipe. | 16 Sep 2009 | 12 Oct 2009 | Complied |
| Amalgamated Construction Limited | The dismantling of a signal gantry near Cuckoo Bridge and piling work between Maindee Junction and Usk Viaduct was not planned, managed or monitored in such a way that ensured, so far as is reasonably practicable, the work was carried out without risks to health and safety. | 8 Sep 2009 | 16 Nov 2009 | Complied |
| Total Solutions (Southern) Ltd | Failure to properly plan or supervise tandem lifting operations concerned with the dismantling of a signal gantry near Cuckoo Bridge within a possession site. | 8 Sep 2009 | 9 Nov 2009 | Complied |
| Network Rail Infrastructure Limited | No suitable system to verify, so far as is reasonably practicable, that basic visual track inspections are carried out within the maximum specified intervals, and therefore missed or incomplete inspections can go unnoticed and remedial actions not be taken to reduce the risk of a train derailment. | 31 Aug 2009 | 31 Oct 2009 | Open |
| Network Rail Infrastructure Limited | The system for informing tack patrollers of the extent of an individual basic visual inspection and how it should be carried out does not ensure, so far as is reasonably practicable, that serious track defects, which could affect the safety of trains, are correctly identified, so that appropriate remedial action can be taken to reduce the risk of a train derailment. | 31 Aug 2009 | 31 Oct 2009 | Complied |
| Blackpool Transport Services Ltd | Failure to ensure, so far as is reasonably practicable, the safety of your employees and others, because there are no adequate arrangements to ensure that the operational speed of tramcars is consistent with hazards presented by the environment through which they travel. | 24 Aug 2009 | 1 Mar 2010 | Open |
| Network Rail Infrastructure Ltd | Failure to provide a safe system of work at various “Red Zone” track patrolling and track maintenance sites in Scotland to ensure staff have adequate warning of approaching trains and protect these staff from the risk of being struck by a moving train. | 19 Aug 2009 | 23 Oct 2009 | Complied |
| English Welsh and Scottish Railway International Ltd | Unauthorized access is not being prevented at Allerton Maintenance Depot, Liverpool, so far as is reasonably practicable because there are sections of wall and fence forming the boundary which allow trespassers to gain entry. | 13 Aug 2009 | 10 Sep 2009 | Complied |
| McNicholas Construction Services Ltd | To revise the arrangements for planning safe systems of work for contractors, subcontractors and others working in possession worksites on Network Rail infrastructure where road-rail vehicles are in use to ensure that all reasonably practicable steps have been taken to organise the site so pedestrians and vehicles can move safety. | 8 Jun 2009 | 16 Nov 2009 | Complied |
| McNicholas Construction Services Ltd | To revise the arrangements for planning safe systems of work for contractors, subcontractors and others working in possession worksites on Network Rail infrastructure where road-rail vehicles are in use to ensure that all reasonably practicable steps have been taken to reduce risks to your contractors and other who are working on the site. | 8 Jun 2009 | 16 Nov 2009 | Complied |
| London Underground Ltd |
You did not ensure, so far as is reasonably practicable, the safety of your employees and others in that you did not provide and maintain a safe system of work for switching traction current off and on in the depot.
|
16 Apr 2009 | 24 Jul 2009 | Complied |
| Network Rail Infrastructure Ltd | Track drainage at Marks Tey was ineffective due to blockages.
Maintenance delivery units do not have adequate arrangements in place for ensuring, so far as is reasonably practicable, that lineside collector drains and outfalls are adequately inspected and maintained. |
21 Jan 2009 | 31 Aug 2009 | Complied |
| Network Rail Infrastructure Ltd | Some of the protective equipment has not been provided and the crossing was not operated in accordance with the conditions and requirements of the order. | 20 Jan 2009 | 30 Jun 2009 | Complied |
| Network Rail Infrastructure Ltd | Failing to comply with the Railtrack Cononley Level Crossing Order 1994 and the Railtrack Cononley Level Crossing (Variation No 2) Order 2005, in respect of road markings at the crossing and its operation. | 9 Jan 2009 | 30 Apr 2009 | Complied |