Skip to main content

Skip to main content

Glossary

Browse the A-Z below for some rail-specific terms that are used in this website, together with their meanings.
 

Choose a letter below:

 

V

Vehicle change

Changes made to the part of a track access contract (Schedule 5) which stipulates which railway vehicles are permitted to be used on the network under Part F of the Network Code.

Vertical profile

The longitudinal vertical profile of the track.