Skip to main content

Skip to main content

Health and safety prosecutions

Details of ORR health and safety prosecutions resulting in convinction since 1 April 2006.

Prior to 1 April 2006, the Health and Safety Executive enforced health and safety legislation for railways and you will find relevant notices on the HSE website.

Company prosecuted Brief description Offence date Court hearing Result
Network Rail Ltd Network Rail pleaded guilty to failings in respect of the installation, maintenance and inspection of adjustable stretcher bars at Potters Bar. 10 May 2002 13 May 2011 £3,000,000
Network Rail Ltd Network Rail pleaded guilty to not preventing unauthorised access to the railway, by failing to adequately maintain trackside boundary fences at Whisby Nature Park. 18 Sep 2009 8 Mar 2011 £15,000
Patrick Finn Mr Patrick Finn, who worked for P Flannery Plant Hire as a JCB excavator driver was using his vehicle to carry tools in the vehicle’s excavator bucket to give to carpenter Mr Henry Sheridan. As he extended the JCB’s arm in the air, the excavator bucket fell onto the head of Mr Sheridan, who died from his injuries. Mr Finn, was sentenced for failing to take reasonable care of other persons at work who may have been affected by his acts or omissions. 3 Dec 2008 4 Feb 2011 £13,000
London Underground Limited During building work at Cannon Street station, the main entrance had a raised step across the threshold to the station, over which a number of people tripped and fell down the stairs inside the station, resulting in a number of serious injuries to 13 members of the public. The incidents occurred over a 6 month period. 21 Sep 2009 17 Dec 2010 £7,000
Network Rail A teenager was struck and killed by a freight train at West Lodge level crossing, Haltwhistle. Our investigation found that Network Rail should have taken steps to reduce the risks of using the crossing, including instructing pedestrians to telephone the signaller before attempting to cross. 22 Jan 2008 26 Nov 2010 £75,000
London Underground Limited Three women were struck by a protective barrier that had come loose from a Central Line train at Mile End station. Our investigation found that LUL did not follow its own procedures to prevent this type of accident and, through poor communication, failed to either secure or remove the barrier. 15 Nov 2009 5 Nov 2010 £5,000
South West Trains Ltd Failing to ensure the health and safety of people working in South West Trains Ltd’s Wimbledon depot, where a worker suffered a broken after he was struck by a hook, which was being used to tow a train into a maintenance shed. 1 Jun 2009 11 Jun 2010 £15,000
Mr Anthony Reen Failing to ensure a high level of inspection when employed as an expert to verify the condition of a boiler on a private steam locomotive. Nov 2006 - 
Apr 2007
24 May 2010 £750
Serco Limited Failing to ensure, so far as was reasonably practicable, that persons not in its employment were not exposed to risks to their health and safety, in that it failed to ensure that automatic trains operating on the Docklands Light Railway system did not hit persons who were on the tracks. 2 Apr 2007 30 Apr 2010 £450,000
Network Rail Infrastructure Ltd Failing to ensure the safety of train passengers, train crew and road users by inadequately maintaining the level crossing at Croxton, near Thetford, Norfolk, following an incident involving the derailment of a train. 12 Sep 2006 16 July 2009 £70,000
Cabin Club Limited Failing to ensure the health and safety of people working in Network Rail’s Chadwell Heath depot, where a worker received extensive burns after he cut into a buried cable believing it to be a redundant oil pipe. 5 Feb 2007 10 Feb 2009 £20,000
Network Rail Infrastructure Ltd Failing to ensure the health and safety of people working in Network Rail’s Chadwell Heath depot, where a worker received extensive burns after he cut into a buried cable believing it to be a redundant oil pipe. 5 Feb 2007 10 Feb 2009 £75,000
Maintrain Limited At Maintrain Limited’s Soho light maintenance depot in Handsworth, Birmingham, a maintenance worker received an electric shock whilst removing a cover used to protect the train axles. The train, which should have been isolated, was electrified at the time.
He suffered significant muscle damage to his chest, burns to his hands and required treatment to his legs which resulted in him being off work for two months.  
16 Feb 2007 12 Jan 2009 £75,000
Jarvis Rail Limited The residual current device (RCD) was defective and had been out of action for at least 20 months, despite several maintenance visits identifying the fault and the need for action. This resulted in two Channel Tunnel Rail Link workers who were carrying out repairs receiving an electric shock when they touched the perimeter fence. There was also a danger to members of the public who walking next to the line could have also received an electric shock had they touched the fence. 23 Apr 2005 19 Sep 2008 £66,000
Network Rail Infrastructure Ltd The residual current device (RCD) was defective and had been out of action for at least 20 months, despite several maintenance visits identifying the fault and the need for action. This resulted in two Channel Tunnel Rail Link workers who were carrying out repairs receiving an electric shock when they touched the perimeter fence. There was also a danger to members of the public who walking next to the line could have also received an electric shock had they touched the fence. 23 Apr 2005 19 Sep 2008 £120,000
Amey Rail Limited Failure to ensure the safety of employees and others who might be affected by its work, which resulted in the death of a track worker who was struck by a passenger train when stepping down from the cab of an engineering train. 11 Jun 2005 29 May 2008 £20,000
LH Access Technology Ltd Death of a worker operating a defective mobile elevating work platform outside Edinburgh Waverley Station. 21 Mar 2006 22 May 2008 £240,000
Border Rail and Plant Ltd Death of a worker operating a defective mobile elevating work platform outside Edinburgh Waverley Station. 21 Mar 2006 22 May 2008 £240,000
Balfour Beatty Rail Projects Ltd During overnight work to upgrade WCML, overhead line remained live. Despite warnings about  their isolation procedures from own safety staff, no improvements were made resulting in employee of Elec -Track Installations suffering burns after receiving electric shock from  overhead line. 1 Jul 2003 9 May 2008 £200,000
GT Railway Maintenance Ltd During overnight work to upgrade WCML, overhead line remained live. Despite warnings about  their isolation procedures from own safety staff, no improvements were made resulting in employee of Elec -Track Installations suffering burns after receiving electric shock from  overhead line. 1 Jul 2003 9 May 2008 £200,000
Elec-Track Installations During overnight work to upgrade WCML, overhead line remained live. Despite warnings about  their isolation procedures from own safety staff, no improvements were made resulting in employee of Elec -Track Installations suffering burns after receiving electric shock from  overhead line. 1 Jul 2003 9 May 2008 £200,000
English, Welsh and Scottish Railways Ltd Failure to maintain the electrical control and indication apparatus, that resulted in a maintenance fitter coming into contact with a live 25k overhead line whilst working on top of a locomotive and sustaining 30% burns.

11 Jan 2006

26 Jun 2007 £30,000
Kier Rail Train struck two loaded wheelbarrows being used by contractors who were repointing brickwork at Manor Park Station. The train was not derailed and the contractors received only minor injuries. 19 Mar 2006 18 Apr 2007 £5,000
Balfour Beatty Rail Infrastructure Ltd Track worker was electrocuted and fatally injured through coming into contact with the live third rail. Aug 2003 19 Feb 2007 £180,000
Network Rail Infrastructure Ltd A track worker acting as a lookout, was hit a by a train and suffered fatal injuries. Inadequate precautions had been taken to plan a safe system of work. 5 Apr 2005 13 Nov 2006 £130,000
Scotweld Limited Track worker acting as a lookout, was hit a by a train and suffered fatal injuries. Inadequate precautions had been taken to plan a safe system of work. 5 Apr 2005 13 Nov 2006 £33,000
Amey Rail Limited Deficient track maintenance caused the train  to derail while passing over a points crossover. Fortunately the train remained upright and there were no injuries amongst the passengers. 24 Nov 2002 12 Sep 2006 £300,000
Network Rail Infrastructure Ltd Deficient track maintenance caused the train to derail while passing over a points crossover. Fortunately the train remained upright and there were no injuries amongst the passengers. 24 Nov 2002 12 Sep 2006 £200,000
GrantRail Limited Platelayer received an electric shock from the 25,000 volt overhead line equipment at Harlow Mill Station. 5 May 2002 11 May 2006 £100,000

Last updated: 13 May 2011